Media releases

Walkers and cyclists are set to benefit from a 4.75km extension to the Wadandi Track following last month’s confirmation that Shire of Augusta Margaret River will receive a $50,000 Lotterywest grant for the project.
Once fully constructed, the recreational trail will stretch 108km following the alignment of former Busselton to Flinders Bay Railway corridor, showcasing the industries and communities the rail line served from 1884 to 1957.
The section of the track within the Shire of Augusta Margaret River local government area  currently provides a continuous track between Cowaramup and Calgardup Road (south of Witchcliffe).
The newly announced grant, along with a matching contribution by the Shire, will enable reconstruction further south to Sebbes Road.
Shire of Augusta Margaret River Director of Infrastructure Dr Markus Botte said the project offered a range of benefits to both locals and visitors.
“Being on a relatively flat gradient, the Wadandi Track caters for walkers and cyclists of all ages and levels of mobility,” he said. 
“It will benefit local residents who can quickly and easily access the trail for commuting or recreation, and the extension will provide an opportunity for longer one-way or return trip excursions.
“The extension will also serve the Margaret River Independent School, providing an opportunity for students to walk or cycle to school away from busy roads.
“It’s also a fantastic tourism drawcard that will attract a range of user groups.”
Once complete, the Wadandi Track will traverse the Shire from north to south and provide a spine that links into several existing and proposed regional paths/trails and to the path networks within the towns through which it passes. 
Together with the existing Cape to Cape Track, Cape Naturaliste-Dunsborough trail, Dunsborough-Busselton shared path and the proposed Flinders Bay-Cape Leeuwin trail, it will form an over 200km long trail within the Margaret River Region.
Construction of the Wadandi Track will achieve a number of outcomes identified in the Shire's Community Strategic Plan, including liveable and well-designed places, connected and safe transport network, quality parks gardens and green spaces, community environmental education, sustainable tourism industry and protection of heritage.
Construction of the track extension is scheduled to commence in April 2018.
 

Community Newsletter

Subscribe to our monthly email newsletter for updates regarding events, changes and general happenings within your community.

Back to top ↑

Contact the Shire

Postal Address

PO Box 61
Margaret River WA 6285

Margaret River

41 Wallcliffe Road
Monday to Friday
9am-4pm
Ph 08 9780 5255
Fax 08 9757 2512

Augusta

66 Allnut Terrace
Monday to Friday
9am-12pm, 1pm-4pm
Ph 08 9780 5255

Emergencies

For contact details for fire, police, bushfire brigades, hospitals, storm damage, power outages, etc please see the emergency contact page

National Relay Service

If you are deaf or have a hearing or speech impairment call us through the National Relay Service

Change of details form

To ensure that you receive your Rates Notice on time we need to be updated on changes. You can do this online.