The Restricted Burning Period (Autumn) will commence at 12.01am on Saturday 4 May 2024 and will remain in place until 11.59pm on 17 May 2024, unless varied. More information here.
Due to scheduled fiber replacement works, the Margaret River Library and Depot will be closed from Sunday 5 May to Tuesday 7 May. We'll reopen during our usual business hours on Wednesday 8 May. Our online services are available 24/7. Explore them at Library Services.

The Shire has experienced ongoing erosion associated with the region’s clay soils. 

Preventing erosion and downstream sedimentation not only improves environmental habitats and the function of natural waterways, but it also reduces the risk of flooding (from the blockage of drainage infrastructure); reduces the costs associated with supplying sand; and improves the streetscape for the community by removing sand and waste from roads and verges.

The following information sheet provides advice on:

  • Site assessment
  • Sediment control requirements
  • Sediment control fences
  • Site management plan
  • Inspection and maintenance.

For more information or to report a concern, please contact us on (08) 9780 5255 or email [email protected]

Share this page

Back to Top of the page